Uzbekistan 150TPD lime production line
Author : Hongji
Introduction:
Country: Uzbekistan
Project: 150TPD lime production line
Equipments: Rotary Kiln,Vertical Preheater,Bucket Elevator etc;
Material:limestone
Capacity: 5 millons tons slime
Description:
The project is located in uzbekistan,is capacity 150 tons per day lime production line,we provide customer with vertical preheater,bucket elevator,production line adopts the rotary kiln φ2.5〜40m,calcined limestone.
Next Article: Two-stage coal gasifier
Previous Article: Kenya 2.2*22m 20t/h coal slime dryer production line
Previous Article: Kenya 2.2*22m 20t/h coal slime dryer production line